Shakin,
Rough estimates made here from the information available. Will not bore you with the calcs, only the bottom line of them...imo!
8-1/2" hole (for 7" liner) will go right through to prognosed TD at 3,137m MD as per AGM preso, although I note they have on that preso a contingent 6" hole. Also prognosed depth for 9-5/8" CP at 1,963m was drilled out to 2,002m (+39m), so we could get a deeper TD.
Allowing time for cleaning the WB, running the 9-5/8" casing string, cement job and wait on it, then trip back in, imo they will be drilling into the top of the secondary target zone (mid upper Pagasa) around early Sat arvo 14/6. They could start getting shows here.
I'm estimating they'll be at TD sometime on Tuesday arvo to that night...all going well!
Imo, we may get our next update including a result (or partial - still logging) say next Wed morning, or we could get one as early as Mond. if they want us to know about anything in the secondary target...ASX rules governing continuous disclosure of material information etc, etc!
This estimate is based on very sketchy info and it also doesn't allow for anymore breakdowns/holdups etc to TD.
Best of luck to all, and I hope we get a result that will clean this seller out quick time!
- Forums
- ASX - By Stock
- baragatan-1 well to be re-spudded nido petrole
Shakin, Rough estimates made here from the information...
-
- There are more pages in this discussion • 120 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NDO (ASX) to my watchlist