Once mining the assumptions are self funding as well if that is what you are referring to?
"We feel that Option 4 is the most realistic as it starts with an 8g/t underground operation for five years at an operating cost of US$600+/oz and a capital cost of US$200m, which would generate more than enough cash flow to fund a 5Mtpa open pit operation mining 4g/t mineralisation at