"Development and construction of the mine has begun. Upgrades of the exploration camp to a long-term mining camp have commenced, in addition to roads and loading facilities construction, as well as community consultations; all currently underway in preparation for the first shipment of ore."
These statements were referenced and not just waved around. The above statements reflect preparation for the 1st shipment of ore! Don't shoot the messenger, here is the link that supports this (LINK)
If these are not facts then I am happy to refute the source, but the company has made this clear, so unless you have something other than a blank paper waving back at me, then it must be reliable!
GLTA
AVQ Price at posting:
9.9¢ Sentiment: Buy Disclosure: Held