FUT 0.00% 1.4¢ future corporation australia limited

atocha project update - hm brian no.1 perforat, page-61

  1. 1,675 Posts.
    lightbulb Created with Sketch. 22

    No,Shimmer you have it right- according to the announcement, mechanically removing the mud,then the acidizing process to improve porosity and permeability, facilitate further testing and allow the creation of a frac plan will take a week- then hydraulic fraccing takes place and we see the final flow results.No time frame given on the final stage.

    Found another video clip that illustrates fraccing in sandstone rather than shale- its similar to the first but still interesting enough. Check it out

    www.oerb.com/Default.aspx?tabid=286

    cheers
    JH
 
watchlist Created with Sketch. Add FUT (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.