Figures are correct wrt to a run rate of 2 Mtpa. The lower capex...

  1. 7,936 Posts.
    lightbulb Created with Sketch. 232

    Figures are correct wrt to a run rate of 2 Mtpa. The lower capex and opex are for initial tonnes on a moving object to make things sound cheaper to finance. The EV of CKA is alot more than $13M including debt. I don't hold PDZ.

    http://www.asx.com.au/asxpdf/20161102/pdf/43clcq5y46x63q.pdf
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.