Referring my previous post re "lacking infrastructure":
A quick trip over the road to the MEL camp provides a decent read in the LWP (lions way pipeline) thread. It appears some solid research has uncovered an article from "pipeliner" eluding the LWP will begin later this year (2012).
As the flowery one states, once LWP is built, the Clarence Moreton Basin will no longer be considered stranded.
IMO this will be a huge boost to opinion. That is, you don't put a pipeline in and not use it. Holding gas resources AND having a method of product transport will be seen positively by the market.
Just need to hang in there IMO and hope ROG can ride out the lack of funds.
Gaspew ;)
- Forums
- ASX - By Stock
- article
Referring my previous post re "lacking infrastructure":A quick...
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add ROG (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.8¢ |
Change
0.000(0.00%) |
Mkt cap ! $32.53M |
Open | High | Low | Value | Volume |
0.8¢ | 0.8¢ | 0.8¢ | $182.1K | 22.77M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
25 | 36939618 | 0.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.8¢ | 11435752 | 15 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
20 | 23393673 | 0.002 |
28 | 92682599 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.003 | 989929 | 2 |
0.004 | 39011968 | 15 |
0.005 | 19447740 | 8 |
0.006 | 8100000 | 4 |
0.007 | 6550000 | 3 |
Last trade - 16.10pm 08/11/2024 (20 minute delay) ? |
ROG (ASX) Chart |