"Does anyone know if the frac trucks are still due on Friday?"
Won't be actually starting till next week now due Halliburton (http://www.halliburton.com/) testing their new pump. Absolutely no issues just the typical on site logistics things which can pose a slight delay.
As you know, Halliburton do a lot of this in the U.S and are leaders in fracking technology so we are in very good hands. All they are doing is running the pump through its paces before they actually start pumping water into the wells, so it is prudent and professional and ensures a smooth process next week when they kick off.
FYI, I have been told that the multi stage frack that they are doing is a better technology as it provides greater and more consistent pressure and typically results in comparatively better flow rates.
ADE Price at posting:
13.0¢ Sentiment: ST Buy Disclosure: Held