What I meant to say was that your last post was complete nonsense
you stated
"400 tonnes Alluvium (grade of 0.03%) is required to produce one (1) Tonne of wet processed ore with grade of 12%.
While 160 tonnes Alluvium (grade of 0.05%) is required to produce one (1) Tonne of wet processed ore with grade of 8%." ---------------------------------------------------------
What makes you think that the higher grades .05% Reo would beneficate at a lower rate ,160 to 1
and the lower grades .03% Reo ate a higher rate, 400 to 1
and what about recovery rate, say 80%
How about I simplify my calculations so you can understand
ROM = .03% - .05% How about we use a very generous .04% , which is at least 33% higher than the published jorc
Recovery rate 80%
output of wet plant 120,000 t @ Treo 8%-12%, let say 10%
-------------------------------------------
Total output of wetplant should be 10,909 t but when I calc
Input 12Mt and 18Mt
12Mt x .04% = 4800 t Treo x 80% recovery = 3840 t Treo
18Mt x .04% = 7200 t Treo x 80% recovery = 5760 t Treo
The maximum Treo contained in 120,000 wet plant output is between 3.2% and 4.8%
No where near 10%
CUX Price at posting:
2.8¢ Sentiment: None Disclosure: Not Held