-
Share
07/03/13
09:17
Share
Hi Tonio,
The reason I didn't add it is that different grades of the alluvium will require very different ratios of the 'wet processed' ore produced.
For example:
400 tonnes Alluvium (grade of 0.03%) is required to produce one (1) Tonne of wet processed ore with grade of 12%.
While 160 tonnes Alluvium (grade of 0.05%) is required to produce one (1) Tonne of wet processed ore with grade of 8%.
For the former it is 45,000 tonnes, while for the latter it is closer to the 120,000 tonnes being 112,500 Tonnes.
With such a difference in volumes I have assumed the ROM is the amount of material required at the begining of each process.
Cheers,
Stoops.
-