KEY 0.00% 0.1¢ key petroleum limited

Given the delays with drilling are due to awaiting DMP approval...

  1. 6,736 Posts.
    lightbulb Created with Sketch. 122
    Given the delays with drilling are due to awaiting DMP approval to start then I can't see us losing the permit. DMP will presumably grant an extension of time.
 
watchlist Created with Sketch. Add KEY (ASX) to my watchlist
(20min delay)
Last
0.1¢
Change
0.000(0.00%)
Mkt cap ! $2.262M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0
KEY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.