GGX 0.00% 0.1¢ gas2grid limited

Drilling is to be done on Jacob well prior to June 2012......

  1. 120 Posts.
    lightbulb Created with Sketch. 1
    Drilling is to be done on Jacob well prior to June 2012... although this was after cleaning out the obstruction and flow testing of Malolos-1 - I think they are using the same equipment?

    So - maybe there is some news regarding Malolos?
 
watchlist Created with Sketch. Add GGX (ASX) to my watchlist
(20min delay)
Last
0.1¢
Change
0.000(0.00%)
Mkt cap ! $4.077M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0
GGX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.