10 holes for 1060m were drilled to confirm historic drill intersections and extend the mineralisation by testing along strike and at depth. Mineralisation was logged in in 9 of the 10 holes: both greisen type alteration as well as discrete quartz veins. 227 samples from individual metres have been submitted for laboratory assay. Results are expected in early July.