Why was the PFS release delayed if that was the result?? A PFS still needs to contain estimations of the outcome, only the numbers used are looser estimates. For some reason they have kept these numbers internal check out jabiru's pre-feasibility study in 2004 http://www.jabirumetals.com.au/ASX/2004/ASX_PIL_3Feb2004.pdf
Where is the reserve statement and mining study that at one stage was going to be released by christmas??
Shareholders have been misled
TRO Price at posting:
0.0¢ Sentiment: LT Buy Disclosure: Held