ADU 0.00% 71.5¢ adamus resources limited

announcement------now awaiting something similar f

  1. 1,727 Posts.
    ASX ANNOUNCEMENT
    12th December 2005
    Adamus Discovers New High Grade Reef Containing
    Intersections up to 8m @ 17.7g/t Gold at the
    Company’s Southern Ashanti Gold Project
    RECENT ASX ANNOUNCEMENTS
    10/11/05
    Exploration Drilling Targeting
    Northern Extension of Salman
    Yields Success
    31/10/05
    First Quarter Activities Report
    07/10/05
    Annual Report
    07/10/05
    Notice of Meeting
    29/09/05
    Diamond & RC Drilling commencing
    first week in October
    02/08/05
    Retirement of Non-Executive
    Director
    LINKS
    Website
    www.adamusresources.com.au
    Stock Exchanges
    www.asx.com.au
    www.tsx.com
    TSXV Public Filings
    www.sedar.com
    Email
    [email protected]
    CORPORATE
    Registered Office
    Level 2
    45 Richardson Street
    West Perth WA 6005
    Postal
    PO Box 568
    West Perth WA 6872
    Telephone + 61 8 9322 5943
    Facsimile + 61 8 9322 5907
    Share Registry
    Advanced Share Registry
    Level 7, 200 Adelaide Terrace
    Perth WA 6000
    Telephone + 61 8 9221 7288
    Facsimile + 61 8 9221 7869
    ASX Code: “ADU”
    TSXV Code: “ADU”
    The Directors of Adamus Resources are pleased to announce that recent
    exploration drilling targeting the footwall of the Salman Shear, within the
    Akanko area, has successfully intersected a new high grade reef, situated
    70m east of the historic Akanko Mine (ref to map). Two RC holes, located
    150m apart, have intersected the new reef returning assays, from 4m
    composite samples, of 8m @17.7g/t and 8m @ 7.3g/t gold. Two additional
    RC holes intersected lower grade mineralization that may represent a
    continuation of the same structure.
    In addition to the new discovery, drilling has also intersected an intact
    section of the main Akanko Reef. Previous drilling had encountered historical
    stopes, but AKRC 065 successfully intersected a broad zone of
    mineralization, which included a low angle intersection (ref to section) of
    24m @ 5g/t gold from 12m.
    Table 1: Summary of RC Drilling Intersections >5 gram metres AU
    Prospect Hole ID Easting Northing From
    (metres)
    To
    (metres)
    Interval
    (metres)
    Gold g/t
    (uncut)
    Akanko Footwall AKRC064 584728 557301 56 60 4 1.92
    AKRC065 584722 557250 0 36 36 3.81
    Including 12 36 24 5.00
    AKRC066 584800 557247 52 60 8 17.70
    AKRC068 584865 557399 28 36 8 7.29
    AKRC072 584750 557249 0 8 8 6.86
    All drilling intersections highlighted above occur at less than 40 metres
    vertical depth.
    Historical records from operations at the Akanko Mine in the late 19th and
    early 20th Centuries suggests free gold from the Main Reef was mined to a
    depth of approximately 40 metres. To date the Main Reef has never been
    drill tested below the 40m limit of the old mine. The historical records made
    no mention of the newly discovered Eastern Reef, suggesting the lode is
    more than likely intact.
    Exploration at Akanko is on going with drilling targeting the 3.7km long,
    northern extension of the Salman shear zone as it passes through the
    Akanko area. Exploration will initially focus on drilling out the main shear
    zone to a sufficient density to allow a resource estimate to be completed.
    Immediately following the drill out of the Salman Shear Zone, exploration will
    seek to further test the recently discovered reefs within the Akanko Mine area.
    With greater understanding of the geometry of the reefs, drilling will focus on
    establishing the true widths and strike extent of the mineralized zones.
    Although the Company’s present understanding of the Akanko area is limited,
    the discovery high grade, reef style mineralization associated with the Salman
    Shear could significantly impact the Southern Ashanti Gold Project.
    Significant results from the on-going drill program will be made available at
    the earliest opportunity.
    Detailed information on all aspects of the Company’s exploration activities can
    be found on Adamus’ comprehensive website
    www.adamusresources.com.au.
    For further information please contact.
    Hamish Halliday
    Managing Director (+61 8 9322 5943)
    “Adamus Resources Limited is a Perth-based mineral exploration company
    which has been listed on the Australian Stock Exchange since June 2001.
    The company owns a range of high quality mineral assets with the current
    focus on unlocking the full potential of the Southern Ashanti Gold Project in
    Ghana, West Africa.”
    Information in this announcement pertaining to exploration results was compiled by Hamish Halliday, a director of Adamus, who is
    a Member of The Australasian Institute of Mining and Metallurgy and a “Qualified Person” under Canadian National Instrument 43-
    101 - Standards of Disclosure for Mineral Projects. Hamish Halliday has sufficient experience which is relevant to the style of
    mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person
    as defined in the JORC Code. Hamish Halliday consents to the inclusion in the announcement of the matters based on their
    information in the form and context in which it appears.
    The TSXV does not accept responsibility for the adequacy or accuracy of this release. No stock exchange, securities commission
    or other regulatory authority has approved or disapproved the information contained herein.
    Caution Regarding Forward Looking Statements.
    Statements regarding Adamus' plans with respect to its mineral properties are forward-looking statements. There can be no
    assurance that Adamus' plans for development of its mineral properties will proceed as currently expected. There can also be no
    assurance that Adamus will be able to confirm the presence of additional mineral deposits, that any mineralization will prove to be
    economic or that a mine will successfully be developed on any of Adamus' mineral properties.
    Phyillite
    LEGEND
    Greywacke
    Meta-volcanics
    Tuff
    Dolerite Dyke
    Fault / Shear
    100ppb Au Soil Geochemistry Contour
    Surface Projection of Current Resource
    Adamus Project Boundary
    Tenement Excision
    Coastal / Dixcove Granitoid
    Granitoid
    Southern Ashanti Gold Project
    Ankobra
    River
    Salman Shear
    0
    SCALE
    2.5 kms
    Project Resource
    18Mt @ 2.0g/t Au
    for 1,200,000ozs
    Anwia Deposit
    Mamposo
    Adamanso Shear
    Shear
    Enlarged Area
    Akanko
    Salman
    North
    Salman
    Central
    0
    METRES
    N
    100
    LEGEND
    Previous RC Drilling
    Recent RC Drilling
    GEOCAD (WA) Pty Ltd Path..adamus\salman\figures\akanko_reefs_dec05.dgn
    Adit 1
    Shaft
    70m
    51m
    57m
    57m
    57m
    63m
    AKRC067
    AKRC65
    AKRC51
    AKRC48
    AKRC66
    Cross Section 557 250mN
    AKRC072
    Main Reef Newly Discovered Eastern Reef
    Salman Shear
    Mineralisation
    Salman Shear
    Mineralisation
    8m @ 7.29g/t Au from 28m
    8m @ 17.7g/t Au from 52m
    8m @ 6.86g/t Au from 0m
    36m @ 3.81g/t Au from 0m
    100ppb Au
    Soil Contour
    Newly Discovered
    Eastern Reef
    Main Reef OPEN OPEN
    Akanko Drillhole Plan
    Cross Section 557 250mN
    Akanko Prospect - New Discovery
    36m @ 3.81g/t Au from 0m
    8m @ 6.86g/t Au from 0m
    8m @ 17.7g/t Au from 52m
    Prospect/ Hole Depth Interval Grade
    Hole East North Azimuth Dip (m) From To (m) (g/t Au)
    Akanko Footwall
    AKRC058 584817 557152 90 -45 63 NSI
    AKRC059 584791 557151 90 -45 51 NSI
    AKRC060 584766 557151 90 -45 50 NSI
    AKRC061 584805 557303 90 -45 75 NSI
    AKRC062 584781 557303 90 -45 51 NSI
    AKRC063 584757 557302 90 -45 55 NSI
    AKRC064 584728 557301 90 -45 69 56 60 4 1.92
    AKRC065 584722 557250 90 -45 57 0 36 36 3.81
    including 12 36 24 5.00
    AKRC066 584800 557247 90 -45 63 52 60 8 17.70
    AKRC067 584774 557248 90 -45 57 NSI
    AKRC068 584865 557399 90 -45 50 28 36 8 7.29
    AKRC069 584839 557399 90 -45 50 NSI
    AKRC070 584812 557400 90 -45 50 NSI
    AKRC071 584787 557400 90 -45 57 NSI
    AKRC072 584750 557249 90 -45 57 0 8 8 6.86
    Notes
    1. All holes drilled by reverse circulation.
    2. All samples collected in 1m intervals and riffle split.
    6. Assays are reported to 3 significant figures within the limits of 0.01g/t analytical precision.
    7. Lower intersection cut-off grade 0.5g/t Au, top-cut grade of 25g/t applied to high assays.
    8. Minimum intersection width 4m; maximum included internal dilution 4m.
    9. NSI indicates no significant intercept.
    3. Assays are for 4m composite samples; assays are yet to be received for 1m sample splits re-submitted for assay.
    4. Assaying conducted by Transworld Laboratories, Tarkwa, Ghana using industry standard 50g lead collection fire assay with AAS finish.
    5. Reference standards, field duplicates and blank samples are routinely inserted at 1:20 and assays of quality control samples are routinely monitored.
    Appendix Two
    Southern Ashanti Gold Project
    Location Orientation Intersection (m)
    Summary of RC Drilling Intersections >5 gram metres Au
 
watchlist Created with Sketch. Add ADU (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.