results look good.
"A further 1,852m have been drilled, with step-out lines having been completed north and south of HFRC005 as well a line south of HFRC019.
Significantly, all the step-out lines have intersected strong shearing, quartz veining and alteration."
Significant results from the maiden drilling included:
HFRC019: 24m @ 1.51 g/t gold (including 4m @ 5.68 g/t gold & 4m @ 2.63 g/t gold) from 12m
HFRC019: 16m @ 1.24 g/t gold (including 4m @ 3.43 g/t gold) from 60m
HFRC005: 20m @ 1.63 g/t gold (including 4m @ 6.19 g/t gold & 4m @ 2.8 g/t gold) from 52m
HFRC015: 12m @ 1.17 g/t gold (including 4m @ 4.07 g/t gold) from surface
HFRC022: 12m @ 0.57 g/t gold (including 4m @ 1.24 g/t gold) from 56m
A run back upto 3 looks to be on the cards IMO.
- Forums
- ASX - By Stock
- GTE
- Ann: Yandal West Gold Project Drilling Update
Ann: Yandal West Gold Project Drilling Update, page-2
-
- There are more pages in this discussion • 61 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add GTE (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.8¢ |
Change
0.000(0.00%) |
Mkt cap ! $14.35M |
Open | High | Low | Value | Volume |
2.8¢ | 2.9¢ | 2.8¢ | $13.07K | 465.9K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 186243 | 2.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.0¢ | 19948 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 3055535 | 0.004 |
22 | 13685797 | 0.003 |
6 | 5650000 | 0.002 |
9 | 8500499 | 0.001 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.005 | 1660000 | 4 |
0.006 | 1000000 | 1 |
0.007 | 502750 | 2 |
0.008 | 750000 | 1 |
0.009 | 708333 | 2 |
Last trade - 15.57pm 15/11/2024 (20 minute delay) ? |
GTE (ASX) Chart |