Tambina work plan commencing, while WBP remains on self-sustaining foothold Highlights ➢ In Australia, the geology team’s upcoming field trip to Tambina – which has three mining leases – will focus on identifying conglomerate-hosted gold targets to test whether small-scale mining operations can re- commence there ➢ For the Jan-Feb period, ore production and net cashflow were within revised bi-monthly targets – the Witwatersrand Basin project (WBP) remains on a self-sustaining trajectory *** West Wits Mining Limited’s (“WWI” or “the Company”) Board is examining the prospects to recommence small scale mining operations at Tambina later in the year, once the geology team has identified suitable conglomerate hosted gold targets. Meanwhile, production and cashflow figures for Jan-Feb are in line with internal targets and the WBP remains on a self-sustaining path. *** Michael Quinert, Chairman commented: “The Board has decided to take an opportunistic approach to the Tambina asset and is now actively reviewing plans to recommence small-scale mining operations there, post an upcoming site visit by the geology team to identify conglomerate hosted gold targets. Having moved to a bi-monthly reporting structure, the board is pleased to confirm that WBP remains cashflow positive and on a self-sustaining foothold, with cashflow at the upper end of the target range.” *** WORK TO COMMENCE AT TAMBINA As the Tambina project has three mining leases, which is a significant comparative advantage over peers, the Board’s intention is to re-commence small scale mining operations as soon as feasible, with a project plan being developed for approval. Utilising significant legacy data made available from the vendors, the geology team are due to commence their inaugural field trip to confirm the location of conglomerate hosted gold targets within the project area. This potentially could result in Tambina contributing modest cashflow toward year end. The Mt Cecelia project has yet to be granted by the WA mining regulator, but the geology team is on standby to implement an exploration program once this is through. West Wits Mining Limited ABN 89 124 894 060 Level 3, 62 Lygon Street Carlton VIC 3053 Australia P +61 3 8692 9049 F +61 3 8692 9040 www.westwitsmining.com
- Forums
- ASX - By Stock
- WWI
- Ann: Work to Commence at Tambina Project
Ann: Work to Commence at Tambina Project, page-2
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add WWI (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.5¢ |
Change
0.001(7.14%) |
Mkt cap ! $40.66M |
Open | High | Low | Value | Volume |
1.4¢ | 1.5¢ | 1.4¢ | $1.415K | 101.0K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 383825 | 1.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.5¢ | 3598137 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 151538 | 0.009 |
7 | 3588613 | 0.008 |
2 | 1409048 | 0.007 |
2 | 2142999 | 0.006 |
3 | 1400000 | 0.005 |
Price($) | Vol. | No. |
---|---|---|
0.010 | 2172152 | 5 |
0.011 | 390000 | 2 |
0.012 | 3000000 | 2 |
0.014 | 1000000 | 1 |
0.015 | 1000000 | 1 |
Last trade - 11.47am 14/11/2024 (20 minute delay) ? |
WWI (ASX) Chart |