re: Ann: OXX: Winchester-1 Weekly Progress Re... Total depth of well 4803m
21 May 2013, the well was at a depth of 2891m
thats basically 3/5s of the total depth.
expected drill duration approximately 80 days from the 7 April spud date to reach
3/5s of 80 days is 48 days.
48 days from 7th april is 26th May
witch this time means its 5 days infront. So not 6. :)
Now while the rest of the program can go either way there not behind>
Also Cyclone Victoria was still around up there april 11 so Im sure it slowed them down. Either way its a good report time wise.