re: Ann: Wilcherry Hill Project Feasibility U... I still awaiting a call from the Coy. Yet they have mentioned shipping costs seperately. So I can only presume to add this to the FOB costs, yet I have requested clarification.
As I will absolutely load up if shipping covered in overall costs. Yet as Stagman stated it is mentioned seperately. No Projected Profit for Yr 1 was mentioned, probably for a reason. Even if based on current commodity cost and currency it would at least give me an indication.
Yet projected profits has been left out- shipping added as a seperate whole section to the FE Study.
So currently I agree with Satgman. Unless told otherwise- if told otherwise i will load up. Currently with shipping added to FOB Costs we could break even, slight loss or good profit. If shipping included in FOB then we either make very good profit or absolutely HUGE profit.
Bif difference.
- Forums
- ASX - By Stock
- Ann: Wilcherry Hill Project Feasibility Update
-
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TYX (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $16.43M |
Open | High | Low | Value | Volume |
0.3¢ | 0.3¢ | 0.3¢ | $10.92K | 3.643M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 5241365 | 0.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.4¢ | 7537470 | 17 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
11 | 4082812 | 0.005 |
4 | 2800000 | 0.004 |
4 | 1350249 | 0.003 |
2 | 1200000 | 0.002 |
1 | 1250000 | 0.001 |
Price($) | Vol. | No. |
---|---|---|
0.006 | 1399110 | 2 |
0.007 | 1117790 | 4 |
0.008 | 4735641 | 9 |
0.009 | 1449688 | 4 |
0.010 | 202241 | 2 |
Last trade - 15.53pm 20/11/2024 (20 minute delay) ? |
Featured News
TYX (ASX) Chart |