Thanks Stoops.
I do want to at some point when I have time to add in the CUX HREO ratios etc to HAS latest presentation graphs to understand more where CUX fits.
HAS have issued a preliminary sulphation/leach/SX flowsheet as their stage 1 option. I am not familiar with NTU proposals.