Now 6 weeks since Arunta drilling commenced (30th Oct - “The Company has now completed an RC drill program comprising 10 holes for 1,878m. Samples have recently arrived at a laboratory in Perth for analysis with results expected late next month.” = late November)
OTH (30th Oct - “Exploration drilling has also been completed at the One Tree Hill Prospect with two, deep diamond holes testing the extensions to mineralisation in CZD0017 intersected in 2016. Assay and DHEM results remain pending.”
I remember saying previously they would release some results before a presentation was due, they did and I think this will be the case again with the annual meeting being held on the 29th (November).
On a side note, the work they have done on the metallurgy is outstanding IMO, the recoveries have increased while the head grade has reduced by up to 50%, wow