...and B2 has an in-house construction team which has delivered very successfully 5 projects. If they’re going to make a move, now would be the time imo.
BTW, the leadership team WAF has put together not too shabby by any means with loads of experience and success in Africa and other difficult mining jurisdictions.
Chairman Mark Connelly is a previous Director of B2Gold.
Ian Kerr and Chief Development Officer Matthew Wilcox have great track records and have both worked for our our chosen EPCM contractor Lycopodium.
No more games here imo, Management dead serious about getting this project to production and have set up the team to get the job done quickly and effectively.
- Forums
- ASX - By Stock
- WAF
- Ann: WAF hits extensive visible gold in 1km hole at M1 South
Ann: WAF hits extensive visible gold in 1km hole at M1 South, page-59
-
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add WAF (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.52 |
Change
0.000(0.00%) |
Mkt cap ! $1.866B |
Open | High | Low | Value | Volume |
$1.53 | $1.53 | $1.48 | $3.819M | 2.538M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 26174 | $1.50 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.52 | 54794 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 3670 | 1.360 |
1 | 4785 | 1.355 |
4 | 42574 | 1.350 |
2 | 26140 | 1.345 |
1 | 4986 | 1.340 |
Price($) | Vol. | No. |
---|---|---|
1.370 | 46444 | 4 |
1.375 | 84504 | 4 |
1.380 | 66843 | 2 |
1.385 | 20785 | 3 |
1.390 | 109785 | 4 |
Last trade - 16.10pm 29/11/2024 (20 minute delay) ? |
WAF (ASX) Chart |