"Initial mining and stockpiling of mill feed has begun after preliminary planning, installation of
critical communication infrastructure and site preparation. The first phase of the mining program
is expected to take 2 to 3 months to complete with a further month for the processing of the
material. Positive outcomes of this phase will be linked with an expanded deeper drilling program,
designed to ascertain the extent to which the mineralisation extends at depth in the mine,
concurrently with development utilizing mechanized equipment and mining of gold bearing zones. This program is part of the Company’s strategy to manage its resources where the mining crew will be utilized at the RoD mine while another crew is occupied on the Maxwell zone drilling and
North Stacpoole drilling at the Morning Star Mine".
Great work AUL. Very positive Ann. Good to see the company making progress. Looking forward to the Processing results.
AUL Price at posting:
0.7¢ Sentiment: Buy Disclosure: Held