The mill is planned to be operational in Early September quarter. That’s about a month’s time. Terrible shame if it all goes down in flames before then.
They’ve already stripped the sulphide pit - and if the sulphide grades are what they have been, 1.7g/t or more, that’s 48000 ounces a quarter. At $800 AISC ( due to stripping brought to this quarter), that’s your $20M. And it’s not even that spectacular - they did this in December quarter mining out that oxide pit.
Anyway, do what you must, and I do what I do.