June 2017: "Pre-stripping of Monkey Hill at Tap AB1 Trough Lode has largely been completed in the June quarter"
March 2018: "The decrease in stockpiles was principally due to a drawdown of in high grade and low grade oxide stockpiles on the ROM following the completion of the phase pit in Tap AB1 Trough Lode."
"Near mine exploration completed in the March 2018 quarter continued to focus on the Tap AB complex targeting extensions and definition of Neo Lode, Tap AB1 Trough Lode, Torres and Urso."
ROM definition: "After mining from nearby open pits, ore is delivered to the run of mine (ROM) pad, where it is sorted according to grade and blended to ensure consistent feed to the feed preparation circuit."
Loki01, Does it not mean the Tap AB1 Trough Lode Phase pit mining was completed, the ore delivered to the ROM pad, where the stockpile was drawn down, now they are targeting extensions of Tap AB1 Trough Lode with further drilling?
@worzel1, 2 weeks of 2g/t mining in January isn't much....
- Forums
- ASX - By Stock
- Ann: US$23 Million Capital Raising
June 2017: "Pre-stripping of Monkey Hill at Tap AB1 Trough Lode...
-
- There are more pages in this discussion • 25 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BDR (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
NXD
NEXTED GROUP LIMITED
Nick Poll, Managing Director
Nick Poll
Managing Director
SPONSORED BY The Market Online