The point is being missed. I do understand the impact of weather conditions and that is expected .. normally!
HOWEVER ... the point I am making is their lack of respect for SHs with the method/content (or there lack of) communication, telling us they would work through winter and then tell us they couldn't, reflects they either tried to fool us then or they did not know jack sheeet about local weather conditions.
- Forums
- ASX - By Stock
- Ann: Update on Timing of Dilling at Lac Rainy Graphite Project
The point is being missed. I do understand the impact of weather...
-
- There are more pages in this discussion • 24 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MLS (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.6¢ |
Change
0.001(4.00%) |
Mkt cap ! $17.45M |
Open | High | Low | Value | Volume |
2.4¢ | 2.6¢ | 2.4¢ | $6.428K | 247.6K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 58056 | 2.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.7¢ | 212500 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
39 | 122202353 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.002 | 41296776 | 14 |
0.003 | 35137432 | 27 |
0.004 | 35014694 | 38 |
0.005 | 39884815 | 43 |
0.006 | 29688284 | 22 |
Last trade - 14.56pm 21/11/2024 (20 minute delay) ? |
Featured News
MLS (ASX) Chart |