Originally posted by avagadro
So it does indeed look like the hold up is now at ALS as I surmised.
I blame AVZ and their stupidly big drill cores.
Positive to see they hit pegmatites in every drill hole. That is some good augering/mapping right there and great that the vastly increased peg sizes have been confirmed.
Yep, at the end of the day it’s a much needed update.
Summary: Waiting for assays re Kanuka, and the reason we haven’t heard anything re Kitotolo is because we have only just started there...
That’s all I was after (for now), a simple update