5th april ann includes Cer, all their ground has been sampled in various formats
agree on high spend, see how they go not the company has floated and is active
Jadar Completes Maiden Field Program at Cer and Bukulja Projects
• Initial reconnaissance and sampling programs on the Bukulja and Cer projects, which are considered prospective for pegmatite bearing lithium mineralisation is completed
• On the Bukulja project, the Company collected 54 stream sediment samples; 16 soil samples; 2 water samples and 10 outcrop samples
• On the Cer project, the Company collected approximately 110 stream sediment samples; 40 outcrop samples and a single water sample
• The Company has confirmed the presence of pegmatitic outcrops on both the Cer and Bukulja licenses • Samples to be dispatched immediately to an accredited laboratory for analysis
• Preliminary evaluation of the sedimentary basin within the Bukulja permit area determines the depth of basin and stratigraphy that may be prospective for sediment hosted borate mineralisation with possible lithium association
JDR Price at posting:
1.7¢ Sentiment: None Disclosure: Held