I keep going back to what NZC have done recently in regards to not only cost optimisation but also in terms of fencing the deposit, meeting with locals etc etc.
Here is some photos.......
View attachment 1120227
Adam COO meeting with locals
View attachment 1120229
Meeting with village Chiefs
View attachment 1120231
Community consultations
View attachment 1120233
View attachment 1120235
Fencing the Kalongwe deposit
View attachment 1120237
Hall design
View attachment 1120239
Facilities being built
View attachment 1120241
View attachment 1120243
Plumbing being installed
Also look at this.....
View attachment 1120247
Full design, look at the bottom left hand corner, that's what is being built at the moment.
And finally where the pit will be
View attachment 1120251
I know several have become frustrated but I know for a FACT that there has been several large EV players in the DRC trying to lock down Cobalt. One of the biggest concerns was traceability of the product, Nzuri will have no problem with that.
This is a legit operation that is well and truly underway in every sense of the word.
Funds will be needed to help progress everything in the right direction, they will ultimately help with the deal that Nzuri can get for debt/equity funding and then potentially a Takeover.
This ain't a micky mouse operation, this is a company backed by the worlds largest cobalt producer, with management who hold 50%, we won't be sold cheap, as for the CR, I'm not in on it but I know it will move us in the right direction and that's all that matters