I would be pretty disappointed if MOD came out with a headline number of 375,000kg. I think you mean 375,000 tonnes of Cu.
My punt is 27Mt @ 1.4% Cu and 18g/t Ag for 378,000t of contained Cu and 15MOz Ag. No idea what Cut-off that would be at though, just calculated an average from the assay results (which provided no cut-off details).
Start the pre-feas and move on to T3 East. I would be much keener to test along strike from T3 than down-dip.
MOD Price at posting:
3.9¢ Sentiment: Buy Disclosure: Held