They're actually going back to the start for the whole design from processing on. The only thing they're keeping is the delineation or the ore.
Even with that remember the recalibration of the method used to determine U grade by radiation probe.
With similar competence levels as PEN one wonders how/why these people actually get paid.
- Forums
- ASX - By Stock
- TOE
- Ann: Toro Advances BPD Studies for Wiluna Uranium Project
Ann: Toro Advances BPD Studies for Wiluna Uranium Project, page-2
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add TOE (ASX) to my watchlist
(20min delay)
|
|||||
Last
26.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $25.25M |
Open | High | Low | Value | Volume |
25.0¢ | 27.0¢ | 24.5¢ | $62.44K | 243.8K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 27122 | 25.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
26.5¢ | 178293 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 629009 | 0.025 |
6 | 1111700 | 0.024 |
4 | 280456 | 0.022 |
3 | 596000 | 0.021 |
3 | 800000 | 0.020 |
Price($) | Vol. | No. |
---|---|---|
0.026 | 537172 | 5 |
0.027 | 1204488 | 7 |
0.028 | 433740 | 4 |
0.029 | 100000 | 1 |
0.030 | 559000 | 5 |
Last trade - 16.10pm 28/11/2024 (20 minute delay) ? |
TOE (ASX) Chart |