From the quarterly, concentrate grade results;
"24m at 2.16% V2O5 from 0m / surface (VRC002) incl. 12m at 2.15% V2O5 (mass recovery 41%) incl. 2m at 2.20% V2O5 (mass recovery 74%)"
No overburden to move so from the first shovel load they are on paydirt..
Can't wait to see the scoping study!