Hmm, another 12 months added till production, in the other presentation (CCC )they wanted stage 1 production starting in Q4 2019, Now assuming same construction time, no mining untill Q1 2021 So basically 2 years now of nothing but permitting.
ACW This biotech stock raised $11M in a risk-off environment. Its Alzheimer's drug could change the game
History-making uranium sample grades and an imminent drill run. Infini Resources is poised to transform in 2025