Probably the smartest TAM management move they made was letting NST run the whole show at CTP and further to that by originally switching from MLX to NST.. Maybe now instead of refurbishing they'll build new re-using what they can and extend hurricane repulse South to South West then drive lower if drilling looks good. NST being the good managers doing the numbers may well have realised to refurb or upgrade would be as expensive as starting from scratch nearby re-using what is salvagable and and having the option of a higher throughput.. I think things are moving along quite well at CTP in regard its viability and NST are drilling ever deeper elsewhere and this one is nice and shallow..
- Forums
- ASX - By Stock
- NST
- Ann: TAM: Central Tanami Project Update
Ann: TAM: Central Tanami Project Update, page-14
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add NST (ASX) to my watchlist
(20min delay)
|
|||||
Last
$17.51 |
Change
0.140(0.81%) |
Mkt cap ! $18.16B |
Open | High | Low | Value | Volume |
$17.48 | $17.55 | $17.28 | $26.79M | 1.534M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 2751 | $17.50 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$17.52 | 36039 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 45378 | 9.020 |
6 | 72217 | 9.010 |
4 | 47094 | 9.000 |
7 | 65586 | 8.990 |
8 | 105898 | 8.980 |
Price($) | Vol. | No. |
---|---|---|
9.040 | 46480 | 7 |
9.050 | 128028 | 11 |
9.060 | 115189 | 10 |
9.070 | 48533 | 4 |
9.080 | 64340 | 6 |
Last trade - 16.10pm 29/11/2024 (20 minute delay) ? |
NST (ASX) Chart |