Colm Cloonan on Vox podcast today said they had completed drilling the 3 vertical wells (own rig drilled these). And more importantly that the lateral drilling would start only in January - that was not clear in previous discussions by them on this aspect.
Everything shuts well and truly down there over the extended Xmas and NY period, so end January before much of anything happens.