Three holes have had samples submitted for metallurgy:
VDD003
35m @ 0.65%V2O5 and 4.53% TiO2 - including 9m from 49m @ 1.04% V2O5 and 6.95% TiO2 (Hole Depth 69m)
VDD004
No results reported. (Hole depth 46m)
VDD005
37m from 13m @ 0.65% V2O5 and 4.52% TiO2 - including 8m from 42m @ 1.10% V2O5 and 7.43% TiO2 - including 2m from 48m @ 1.56% V2O5 and 10.2% TiO2
All three holes were first reported in the 25th October announcement so one would imagine results wouldn't be far away.