does anyone have a connection to the company and can validate what is next..?
See last entry in the JORC Code table, re ann:
Column 1
Column 2
Column 3
1
Further work
The nature and scale of planned further work (eg tests for lateral extensions or depth extensions or large-scale step-out drilling). Diagrams clearly highlighting the areas of possible extensions, including the main geological interpretations and future drilling areas, provided this information is not commercially sensitive.
Geophysics Regional MLEM geophysical surveys are planned to continue to provide full coverage of the 40 kilometre length of prospective ultramafic stratigraphy secured by the project tenure. Down Hole Electro-Magnetics (DHEM) is proposed in conjunction with the already successful geochemical and geological modelling. Further DD drilling is continuing and targeted to locate the modelled centre of the host komatiitic lava channel which is interpreted to be the source of the Nickel sulphide mineralisation.
MPJ Price at posting:
0.5¢ Sentiment: Hold Disclosure: Held