Did the original scoping study estimate include any these mining, power plant operation, borefield water, tailing disposal, campsite, and product transport and sales).
into last scoping study.
Why I ask is dont want it to be dressed up and repackaged to look better than it is.
Good work by new engineers to shave this much off the top if none of these were included.
- Forums
- ASX - By Stock
- Ann: Specialty Metals Project PFS update
Did the original scoping study estimate include any these...
-
- There are more pages in this discussion • 11 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KRR (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $13.75M |
Open | High | Low | Value | Volume |
1.2¢ | 1.2¢ | 1.2¢ | $49.56K | 4.130M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 1668091 | 1.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.3¢ | 1909799 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
22 | 6200311 | 0.009 |
8 | 28480304 | 0.008 |
5 | 5799516 | 0.007 |
6 | 5100808 | 0.006 |
12 | 8038888 | 0.005 |
Price($) | Vol. | No. |
---|---|---|
0.010 | 1100000 | 2 |
0.011 | 2390000 | 4 |
0.012 | 1242985 | 7 |
0.013 | 1846567 | 8 |
0.014 | 972413 | 7 |
Last trade - 13.01pm 22/11/2024 (20 minute delay) ? |
Featured News
KRR (ASX) Chart |