These guys seem jinxed. That makes two out of three wells with stuck drill pipe (F2 and F3), with the drill stem in F2 unrecovered (from memory). Will they be forced to drill another well, F4, if they can't recover the drill stem again? Maybe they need to hire a more reliable driller?