The SXY monthly indicates on the page 3 picture the total length, including the 1500M lateral - at 5200M.
The current status most recent (it would be Sunday 2400 going on previous announcements) - 3840 M
That's 1350 to go, but I will give you an extra 100m for the timing.
The important thing is they are still obviously in the formation, and the results must continue to meet and exceed the pre-established benchmarks.
I might have to extend my area calculation to take in the distance from the intersections between the original drill and the formation, and where the lateral intersected.. lets say another 250M making an equilateral triangle.?
9.6km2.. and $25M per metre?
PGS Price at posting:
1.3¢ Sentiment: Hold Disclosure: Held