VRX 0.00% 3.9¢ vrx silica limited

Oh, and I expect the opex to be minuscule compared to turnover....

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 269 Posts.
    lightbulb Created with Sketch. 55
    Oh, and I expect the opex to be minuscule compared to turnover.

    Heat/light/power/water/security etc - all modest
    Rates?

    Common for three plants:
    2 maintenance people
    1 admin person
    1 manager

    Each plant
    2 or 3 operators for sand machines per shift x 3 shifts
    4 or 5 Dozer drivers per shift x 3 shifts
    4 or 5 sorting out the truck/train loading per shift x 3 shifts
    2 dogsbody per shift x 3 shifts

    I don't know if the dozers and such like equipment are included in the capex figures. If not, there is a cost to procuring/hiring these items as well.

    So, the labour costs above could be under $15k per day against 6k tonnes of sand out the gate - potentially in the order of $1m per day turnover.

    Even though all of the above is made up off the top of my head and having no relevant experience or knowledge, you can see that opex is going to be virtually insignificant compared to the turnover. I would love to hear from somebody with actual experience in a similar situation who could add some credibility to these numbers - or completely rubbish them if they are bollocks.

    How many people at the portside? Would this be done by the port and charged?

    For a 300tph / 2mtpa operation, they would need to be 24 hour round the clock for 300 odd days a year.

 
watchlist Created with Sketch. Add VRX (ASX) to my watchlist
(20min delay)
Last
3.9¢
Change
0.000(0.00%)
Mkt cap ! $18.84M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
1 46511 4.6¢
 

Sellers (Offers)

Price($) Vol. No.
4.0¢ 9225 1
View Market Depth
Last trade - 16.12pm 15/11/2024 (20 minute delay) ?
VRX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.