Drilling proposal being reviewed. Contract expected to be executed in 2 weeks.
Coring in 8 weeks (150m only), subject to rig availability.
Geez this is a slow burn, but a great entry at $3.5M MC.
This phase of the farm in is fully funded. Risk is low, and great potential reward.