The move to 20 cents may herald a trading halt on Monday as this first hole must be complete now. I believe that the first hole was drilled to 500m. Each hole of this drilling may take a week to complete if they are all drilled to 500M
The interesting hole will be the one drilled into the gravity high. which all hits to date are vectoring toward.
GLTA
DYOR
Hurry up Monday.
- Forums
- ASX - By Stock
- BUX
- Ann: Significant Massive Sulphide Mineralisation at Conductor J
Ann: Significant Massive Sulphide Mineralisation at Conductor J, page-51
-
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add BUX (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.5¢ |
Change
0.004(7.84%) |
Mkt cap ! $13.36M |
Open | High | Low | Value | Volume |
5.2¢ | 5.5¢ | 5.2¢ | $6.36K | 120K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 50000 | 5.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.5¢ | 124843 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 246317 | 0.110 |
1 | 95000 | 0.105 |
3 | 40000 | 0.100 |
1 | 20000 | 0.099 |
1 | 96395 | 0.086 |
Price($) | Vol. | No. |
---|---|---|
0.115 | 30685 | 1 |
0.120 | 1275 | 1 |
0.125 | 501352 | 7 |
0.130 | 241062 | 4 |
0.140 | 9000 | 1 |
Last trade - 10.16am 27/11/2024 (20 minute delay) ? |
BUX (ASX) Chart |