MOD 0.00% 42.5¢ mod resources limited

The timeline I work from myself is 3 Months minimum from hole...

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 709 Posts.
    lightbulb Created with Sketch. 81
    The timeline I work from myself is 3 Months minimum from hole being completed to when we might expect assays. 4 to 6 Months even might not be ridiculous if they plan to release assays for several holes at once.

    Timeline is due to labs being overworked currently, MOD having an enormous amount of drilling/sampling requiring preparation, transport, assay, then reconciliation. T3/TRex still have rigs there, T1 has been getting drilled out for months with no assays reported yet.

    I don't doubt though that they'll be pushing the new cores right to the front of the queue, so hopefully assays come back faster tham expected.
    I don't expect anything before 3 Months though.
    Just what I have observed.
 
watchlist Created with Sketch. Add MOD (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.