Don’t forget it was the year in which Hazer achieved continuous production, very good battery testing results, scaled-up to PPP 2.0 and produced 3x more than designed for, set in motion the design of commercial-scale plants, and helped bring MIN’s pilot plant to the point of start-up.
This was all essential groundwork, and it looks to have been a success.