the JORC resource is 1,178,000 tonnes however who knows how much of that is mineable? if 100% was mineable, this would be a 10 year mine life but generally its not 100% mineable.
since this is not a consistent open cut deposit resource, it is probably difficult to estimate the % recovery of ore but generally you would say 70%
the current mining program is for 445,518 tonnes, which is 4 years based on current intentions
within 9 months, they hope to mine 10,000 tonnes per month or 120,000 tonnes per year