The operator refuses to disclose how long it takes to get a permit to frac,,, but everyone knows it takes over a month and a half,,, we have to consider the holidays also,, why not disclose. Or can only the golden one Peter disclose that.?
How much capital has sgc left then? Is that why the full plans get briefed to some but the rest go to hell?
This hyped up gas flare announcement, as I said at the time, better have lived up to the hype... or the risk you take of hyping up your share damages your professional credibility, throw in some analytical insanity and your knocking on the door of totally losing all credibility
So now we wait... and for months,,, and imho many holders will draw some conclusions that its a long wait and just bail...
Stop treating holders like imbeciles,,, imho we should not be forced to pay subscriptions just to get informed... we should all rank even...
- Forums
- ASX - By Stock
- XST
- Ann: SGC: Extended Production Test Planned for Dempsey Well
Ann: SGC: Extended Production Test Planned for Dempsey Well, page-4
-
- There are more pages in this discussion • 19 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add XST (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.893M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
XST (ASX) Chart |
Day chart unavailable