No doubt that no drill production is a best case scenario , but as you say they need to find out .
There is likely to be a gas resource but it all depends on the permeability and the subsequent flow rates .
If the flow rates are good enough then the money for 9 miles of pipeline will become available .
If the casing integrity is a problem it is back to the drawing board .
gltah
- Forums
- ASX - By Stock
- Ann: SGC: Alvares Testing and Operations Update
No doubt that no drill production is a best case scenario , but...
Featured News
Add XST (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.893M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
XST (ASX) Chart |
Day chart unavailable