Hi BeeJaye.
Just a couple of snippets, nothing of note though.
I have just realised that AC holes 1-8 and 101-105 were drilled south of Citra 8-plus days ago.
Here (13 in total) they are bottom left in today's Appendix 2.
Whilst they appear as completed AC holes (red dots) in today's report and not in the 16/5 report, so as to make it appear that they were drilled since last Tuesday, they were in fact drilled previously. Their details are on page 4 (holes 1-8) and page 5 (101-105) of the 16/5 report at depths ranging from 25ms to 92ms.
The AC hole numbers interest me. In the 16/5 ann, ACs 1-32 and 101-130 are Tabled. Today they continue the separate sequences = ACs 33-59 and 131-162. Total so far =121 ACs. Does the separate sequence mean that there are 2 drilling teams?
Interesting to note that RC 1 had the same collar co-ords as AC 125.
- Forums
- ASX - By Stock
- AUR
- Ann: SFR: Doolgunna Project - Exploration Update
Ann: SFR: Doolgunna Project - Exploration Update, page-23
-
-
- There are more pages in this discussion • 14 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add AUR (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.7¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.383M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 1316025 | 0.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.8¢ | 393286 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 103729 | 0.030 |
1 | 218636 | 0.028 |
1 | 300000 | 0.024 |
2 | 200000 | 0.022 |
1 | 100000 | 0.020 |
Price($) | Vol. | No. |
---|---|---|
0.031 | 20000 | 1 |
0.034 | 194955 | 1 |
0.035 | 665000 | 1 |
0.036 | 58747 | 1 |
0.039 | 82835 | 1 |
Last trade - 16.12pm 08/11/2024 (20 minute delay) ? |
AUR (ASX) Chart |