This should mean they can drill all the Atlas wells (60ish), before the Roma wells.
Previously they were going to drill 15 Atlas wells (under previous permits) and then trasfer the rig to Roma until the final Atlas approvals were received.
Now it should be back to back Atlas wells which is better from a downtime and Financial return perspective.
Now we await the Drill rig contract and timing.