Well, I certainly underestimated the cost of the plant. Looks like they will have a 2 stage DMS, a bit more complex than I thought.
Cost is on par with our Pilbara peers stage 1 as I think they have the advantaged on not making any mistakes they may have had during construction.
Another drilling program kicked off which is good. If they can increase KA to 50Mt then more interest they will see in funding.
Haplo
- Forums
- ASX - By Stock
- Ann: Scoping Study confirms potential for a new WA lithium mine
Well, I certainly underestimated the cost of the plant. Looks...
-
- There are more pages in this discussion • 16 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LTR (ASX) to my watchlist
(20min delay)
|
|||||
Last
84.5¢ |
Change
-0.010(1.17%) |
Mkt cap ! $1.612B |
Open | High | Low | Value | Volume |
85.0¢ | 86.5¢ | 83.5¢ | $5.151M | 6.083M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 23487 | 84.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
85.0¢ | 286512 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
10 | 1641167 | 0.019 |
3 | 712500 | 0.018 |
3 | 794117 | 0.017 |
1 | 200000 | 0.015 |
1 | 60000 | 0.014 |
Price($) | Vol. | No. |
---|---|---|
0.020 | 1985261 | 1 |
0.021 | 1256198 | 4 |
0.022 | 1128862 | 5 |
0.023 | 1750000 | 3 |
0.024 | 480229 | 3 |
Last trade - 16.10pm 18/11/2024 (20 minute delay) ? |
Featured News
LTR (ASX) Chart |